Allouez (Wis.)

Taxonomy

Code

Scope note(s)

Source note(s)

  • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

Display note(s)

Hierarchical terms

Allouez (Wis.)

Allouez (Wis.)

Equivalent terms

Allouez (Wis.)

Associated terms

Allouez (Wis.)

1493 Archival description results for Allouez (Wis.)

1493 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 17593, Allouez, Wisconsin, 1910.

AFE 17593, Allouez, Wisconsin, 1910. Install Signal Circuit Between Tower at Omaha Crossing and Tower on Ore Dock. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $41.12. Series I. Lines East. Mesabi Division. Other Subject Categories: Signals, Other

Great Northern Railway Authorization for Expenditure (AFE) 17251, Allouez, Wisconsin, 1921.

Great Northern Railway Authorization for Expenditure (AFE) 17251, Allouez, Wisconsin, 1921. Construct Three Material Tracks, One 694.5' Long on West Side of Dock # 1, One 1378' Long and One 853' Long in Material Yard. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $0. Series II. Lines East. Mesabi Division. Other Subject Categories: Track, Industry

Great Northern Railway Authorization for Expenditure (AFE) 1675, Allouez, Wisconsin, 1951.

AFE 1675, Allouez, Wisconsin, 1951. Place Yard Building with Telephone for Use of Car Inspector in Empty Yard. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $130. Series CER. Lines East. Mesabi Division. Other Subject Categories: Station Facilities

Great Northern Railway Authorization for Expenditure (AFE) 16719, Allouez, Wisconsin, 1921.

AFE 16719, Allouez, Wisconsin, 1921. Placing 5300 Secondhand Tie Plates 4 1/2" Base in Track As Follows: 400 in Track No. 50, 1300 at West End of Yard "E" Between Standpipe and Crossover Swtich to Rip Track, and 3600 in Patches Between South Shore Crossing and E.End of Yard 8 Where Not Already Plated. Replace 2700 Broken Mekkeable Tie Plated with Secondhand Tie Plates 4 1/2" Rail Base As Follows 2200 in West Lead and 500 in East Lead to Classification Yard No.2. Replacing 3000 Broken Malleable Tie Plated with Secondhand Tie Plates 5" Reail Base As Follows: 1000 in West Lead, Yard "D" and 2000 in Roundhouse and Wye Switches. Interstate Commerce Commission Account Number 10 Other Track Material Cost: $2700. Series II. Lines East. Mesabi Division. Other Subject Categories: Track Maintenance, OTM

Results 1371 to 1380 of 1493