Chemult (Or.)

Taxonomy

Source note(s)

  • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

Hierarchical terms

Chemult (Or.)

BT Oregon

47 Archival description results for Chemult (Or.)

47 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 83512, Chemult, Oregon, 1952.

AFE 83512, Chemult, Oregon, 1952. Construct New Interchange Track 1864 Feet Long, 851 Feet New Connecting Track 1200 Feet Long and Remove Present Connecting Track 992 Feet Long for Interchange with Southern Pacific. Interstate Commerce Commission ... »

Great Northern Railway Authorization for Expenditure (AFE) 83715, Chemult, Oregon, 1953.

AFE 83715, Chemult, Oregon, 1953. Replace Gas Operated Pumping Equipment at Section House with Electric Operated Motor Jet Pump and Pressure System. Interstate Commerce Commission Account Number 17, Roadway buildings. Cost: $589. Series A. Lines ... »

Results 31 to 40 of 47