- US WaBuPNRA BB030656
- Item
- undated
Milwaukee Road Engineering Drawing: Cross Frame/End Stiffener/Sole, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 12, undated.
4 results with digital objects Show results with digital objects
Milwaukee Road Engineering Drawing: Cross Frame/End Stiffener/Sole, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 12, undated.
Milwaukee Road Engineering Drawing: Connection/End Stiffener, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 11, undated.
Milwaukee Road Engineering Drawing: Bottom Lateral Bracing, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 10, undated.
Milwaukee Road Engineering Drawing: Bent Details, Bridge 3.2 (FF808), north of Cedar Falls, Washington, Line Segment 398, Milepost 3.2. Sheet 391 - 8645 - 2, undated.
Milwaukee Road Engineering Drawing: Abutments, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 3, undated.