Showing 152108 results

Archival description
Print preview View:

21416 results with digital objects Show results with digital objects

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland, Oregon to Goble, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1808. Place standard culvert signs at all culverts. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1852. Correspondence File Number A50. Portland Division. Other subject categories: Signs Culvert.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland, Oregon to Goble, Oregon, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1481. Rebuild 16,845 lineal feet of right of way fence and repair 10,700 lineal feet of right of way fence between milepost 4 and milepost 40 and add one wire to fence on each side of track between milepost 4 and milepost 11, Portland, Oregon to Goble, Oregon, to keep stock off track and the one wire is added on this section because there are only three wires on the fence at present. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1571. Correspondence File Number A13. Terminals Division. Other subject categories: Fencing.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland, Oregon City Limits to Willbridge, Oregon, 1913.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 668. Ballasting double track between City Limits and Willbridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 701. Correspondence File Number 12-1. Terminals Division. Other subject categories: Ballasting.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland Division, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1439. Install one no. 8 iron wire from Astoria to Flavel, to give the offices in Portland direct communication with Astoria, Warrenton and Flavel. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1536. Correspondence File Number A-10. Portland Division. Other subject categories: Telephone.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland Division, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1754. place 46,000 tie plates on tie renewals between Goble and Holladay, and 20,760 tieplates on renewals on bridges between Goble and Holladay. Necessary to protect replaced ties to get longer service from them. Provided in 1917 budget. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1811. Correspondence File Number A73. Portland Division. Other subject categories: Track Tie Plates.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland Division, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1805. Renew 35 wood box culverts with concrete pipe between Goble and Holladay. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1861. Correspondence File Number A50. Portland Division. Other subject categories: Culverts.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland Division, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1735. Install 12 standard Impaired Clearance switch signs, 2 standard Impaired Clearance Signs on posts and move 47 bridge signs, between Willbridge and Goble, to comply with Order No. 99 of the Public Service Commision of Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1724 (?). Correspondence File Number A47. Other subject categories: Signs.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Portland Division, Oregon, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1664. Install 46 Impaired Clearance switch signs, 15 Impaired Clearance signs on posts, move 76 bridge signs, 14 danger trespass, etc., signs, one train box shed, widen one telltale and cut off six water barrel, Goble to Hollady, to comply with Order No. 99 of Public Service Commission of Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1725. Correspondence File Number A47-1. Portland Division. Other subject categories: Signs Clearance .

Results 2181 to 2190 of 152108