Showing 35 results

Archival description
East Portland (Or.)
Print preview View:

3 results with digital objects Show results with digital objects

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1963. Proportion of cost in installing additional telltales at Burnside Bridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1987. Correspondence File Number X368-85. Terminals Division. Other subject categories: Bridge Telltales.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1447. Special assessment account reconstruction of trunk sewer in East Alder Street, Portland, Oregon; 37 lots at $5.58 each. Chief Engineer/Standard Maintenance Procedure AFE Number RW T71. Correspondence File Number X368-7. Terminals Division. Other subject categories: Assessment Sewer.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1882. Special assesment acount street improvements at East Portland, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number RW T108. Correspondence File Number X368-X. Terminals Division. Other subject categories: Assesment.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1811. Raise rail on East 3rd Street. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1882. Correspondence File Number X368-X. Terminals Division. Other subject categories: Track Raising.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1943. Reconstruct freight house of concrete. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1971. Correspondence File Number X368-78. Terminals Division. Other subject categories: Structure Freight House.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1809. Make changes to sprinkler system in John Deere Building. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1896. Correspondence File Number X368-77. Terminals Division. Other subject categories: Fire Protection.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1456. Take out the double 80 pound built up crossing at East 3rd and East Morrison Streets, East Portland, Oregon, and replace with 2nd hand 114 pound manganese crossing from the United Railways. Necessary for the safe operation of traffic at this point. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1552. Correspondence File Number X368-4. Terminals Division. Other subject categories: Tracks Railroad Crossing.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1480. Install new toilets, repair basement floor and wall; repair furnace, elevator, roof, tank, lights, sprinkler system; paint the outside; all on John Deere building, East Portland, Oregon, on East Yamhill Street between East First and East Second Streets, to make building acceptable for use of tenant who desires to lease same. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1565. Correspondence File Number X368-77. Terminals Division. Other subject categories: Structure Improvements.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1915.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1259. Building 120 feet of connecting track near 2nd and Burnside Streets at East Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1361. Correspondence File Number X368-1. Terminals Division. Other subject categories: Tracks Connecting.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), East Portland, Oregon, 1915.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1123. Payment to complete SP&S title to Lots 3 to 6, Block 81 at East Portland, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number RW 22. Correspondence File Number X368-7. Terminals Division. Other subject categories: Real Estate Purchase.

Results 1 to 10 of 35