Everett (Wash.)

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Everett (Wash.)

Everett (Wash.)

Equivalent terms

Everett (Wash.)

Associated terms

Everett (Wash.)

1331 Archival description results for Everett (Wash.)

1331 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 39521, Everett, Washington, 1929.

AFE 39521, Everett, Washington, 1929. Payment in Full of Assesssment Levied Against Railway Company Property for The Improvement of Norton Avenue. Interstate Commerce Commission Account Number 39, Public improvements; construction. Cost: $16915. Series II. Lines West. Cascade Division. Other Subject Categories: Station Facilities

Great Northern Railway Authorization for Expenditure (AFE) 39448, Everett, Washington, 1929.

AFE 39448, Everett, Washington, 1929. Payment of Assesment for The Improvement of 14th St. Trestle. Interstate Commerce Commission Account Number 2, Land for Transportation Purposes. Cost: $936. Series II. Lines West. Cascade Division. Other Subject Categories: Station Facilities

Great Northern Railway Authorization for Expenditure (AFE) 39035, Everett, Washington, 1928.

AFE 39035, Everett, Washington, 1928. Replacing Present Staff System with Automatic Block Signal System Between Everett Junction. and Pacific Avenue, Everett. Washington. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $3000. Series II. Lines West. Cascade Division.

Great Northern Railway Authorization for Expenditure (AFE) 38625, Everett, Washington, 1928.

AFE 38625, Everett, Washington, 1928. Relay with New 110# Rail Approximately 31 Miles of Main Line, Replacing 90# Rail As Follows:
In Single Track Main Line
From Sta. 91+70 Near East End of Everett Tunnel (End of 110# Rail Laid in 1927) to Station 1815.81 H.B. of #15 Turnout at Everett Jcvt. a Distance of 1.67, miles in Both Main Tracks
From Station 1815+81 Everett Junction. to Sta. 1049+28.4, East Switch Edmonds, a Distance of 14.53 Miles (Each Track)
Provide 8 Grip Rail Anchors Per 39' Panel of Track
Provide 7 1/2 X 10 1/2" Tie Plates Out of Face.
Provide Space Ties to Make 24 Ties Per 39' of Panel Track
Furnish 50% New Track Spikes 5 8/6"
Relay 12 #11 and 2 #15 Turnouts Using 110# Material
Provide Washed Ballast From Above in Addition Ballast Coast Line From Everett Junction. to Hewitt Avenue. Using Washed Ballast From Reiter.
Track to Be Raised on Present Washed Gravel and Filled in with New Washed Gravel at Mosher Move Crossover West.
At Oil Station (M.P 31) Rearrange Tracks at East End. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $483780. Series II. Lines West. Cascade Division.

Results 261 to 270 of 1331